{"id":8027,"date":"2020-07-24T04:21:16","date_gmt":"2020-07-24T04:21:16","guid":{"rendered":"https:\/\/www.altonmo.com\/?p=8027"},"modified":"2020-07-23T17:25:30","modified_gmt":"2020-07-23T17:25:30","slug":"a-sure-sign-of-summer-everywhere-you-drive-is-under-construction","status":"publish","type":"post","link":"https:\/\/www.altonmo.com\/travel\/a-sure-sign-of-summer-everywhere-you-drive-is-under-construction-20200724","title":{"rendered":"A Sure Sign Of Summer: Everywhere You Drive Is Under Construction"},"content":{"rendered":"
Alton, Mo. \u2013 <\/strong>Alton, Missouri has additional roadwork going on. First, the Missouri Department Of Transportation (MODOT) is working close to Alton, on P Highway. Then MODOT is working on Highway 160<\/a> west of Alton. Now MODOT has moved into town paving Vine Street.<\/p>\n MODOT is resurfacing Vine Street in Alton. Beginning at Market Street and paving up to School Street. In common terms, Paving goes from The Community Worship Center to the entrance to the schools.<\/p>\nWhere Is The Paving?<\/h2>\n